To reduce stress, workers trapped in tunnel will now play Ludo and snakes and ladders, smartphones sent

To reduce stress, workers trapped in tunnel will now play Ludo and snakes and ladders, smartphones sent

It has been 15 days since 41 laborers were trapped in the Silkyara Tunnel of Uttarkashi. The workers trapped inside are hopeful that they will be taken out soon. However, there are many problems in the rescue operation. In view of this delay, the officials engaged in the rescue operation of the tunnel have sent smart phones to the workers trapped inside. Through these smartphones, the workers trapped inside will reduce their stress by playing games like Ludo and Snakes and Ladders.

This decision has been taken to divert the attention of the workers from their problems. So that the workers trapped inside can play games and console each other in times of trouble. It will be easier for them to spend time in the tunnel through smartphones. The mobile phones that have been sent to the workers trapped in the tunnel. Among them, Ludo, Snakes and Ladders and other games have been downloaded and sent.

Due to panic, some workers stopped eating and drinking

While talking to the media, some family members had said that some people trapped inside are very worried. He has also stopped eating and drinking. He is feeling nervous due to staying inside for many days. Therefore, the rescue team has sent phones to the workers trapped inside to play the game. Perhaps after the arrival of smart phones, their mind will be diverted and they will not have any problem like restlessness.

10 meters of drilling is left

Let us tell you that only 10 meters of drilling is left to rescue the workers trapped in the tunnel. If the blade of the auger machine had not broken, this drilling would have been done easily. At the same time, now the rescue team has started working on two plans for drilling. The rescue team will now drill vertically. Also, drilling of the remaining 10 meters will be done manually.

Vertical drilling will take time

Vertical drilling work will start in a day or two. First the machine will be taken to the top of the mountain and installed. Only after that the drilling process will start. To drill vertically, approximately 81 to 86 meters will have to be drilled. It is expected to take a lot of time to do this.

Also read: 41 lives stuck at a distance of 10 meters, auger machine failed; Now work is being done on these two plans

Leave a Reply

Your email address will not be published. Required fields are marked *