Prime Minister Narendra Modi may come to Bihar in September, will inaugurate Patna Metro – News Himachali News Himachali

Patna metro: The primary corridor of Patna Metro will be inaugurated by Prime Minister Narendra Modi next month. Preparations are being done loudly for this. The Prime Minister has a possible program to visit Bihar in the third or fourth week of September.

Meanwhile, preparations are being made to inaugurate the metro. However, Patna Metro Rail Corporation has not received a consent letter from the Prime Minister’s Office regarding the inauguration. At the same time, the supply of electricity in the metro depot will start in three days. After which the power supply will be done in a phased manner between Malahi caught from New Pataliputra bus terminal station of primary corridor.

The power sub -station of the depot will have electricity supply from the power grid. As soon as the power supply in the depot starts, the metro trial will move a step further towards the run. According to the information, the trial run of the metro will start in the first week of September. The primary corridor will be inaugurated after a trial for about 15 days. The construction agency has been directed by Patna Metro Rail Corporation to prepare for running the metro between five stations of the primary corridor. But sources say that the construction of three stations can be completed by the third or fourth week of September.

Electricity supply and RSS contribute special contribution in the operation of metro

The RSS control room, also known as Operation Control Center, plays an important role in the smooth operation of the metro system. It is a centralized location, from where the entire metro network is monitored and controlled. It gives information about the real -time of stations, trains, signaling, power supply and other important systems. Which makes it possible to respond to any unusual situation or emergency immediately. The RSS control room has a real -time monitoring of the entire metro network through various cameras, sensors and other equipment.

It tracks the movement of trains, manages the schedule and addresses any delay or disruption. RSS control is operated only after getting power supply. The RSS control room controls the signaling system, ensuring that trains run safely and efficiently. At the same time, it is also responsible for responding to emergency situations and implementing security protocols. Apart from this, ventilation, air conditioning and other systems are also managed.

Finishing of metro compartment in the first corridor

The finishing work of the metro coach running in the primary corridor has been completed. Due to which the metro trial is fully prepared for run. Each coach with a three -coach metro will have a capacity of about 300 passengers, so that the environment is not damaged with low cost. About 300 passengers will have a capacity to sit and stand in every coach, that is, about 900 passengers per trip in three coaches will be able to travel. The primary corridor has five stations, including New Pataliputra Bus Terminal Station, Zero Mile Station, Bhootnath Station, Khemanik Station and Malahi Pakri Station.

Leave a Comment