The first rack of Patna Metro has reached Patna from Gujarat, causing the city to move towards modern transport. The rack was unloaded on the bypass of the city and the trial run will soon begin.
The first rack of Patna Metro train has reached the capital of Bihar. With this, Patna has taken the first step towards the modern and smooth transport system. The rack was brought on the road from the Alstom Factory in Sevli in Vadodara, Gujarat to Patna.
Patna Metro rack was carefully unloaded near Pier No 133 located in the bypass of the city. This is an important stop for Patna’s metro project, which lays the foundation for the fast and smart journey of the future city.
When the metro rack reaches Patna, Patna Metro Rail Corporation shared this moment on social media platform x and wrote- ‘Are you ready? Once a dream is, now it is going to be a reality. ‘This message was enough to fill pride and enthusiasm in every Patna. This will give a new identity to the city and we will all move forward towards Bihar modernity.
Patna Metro will pass through five stations in the first phase, in which they will pass in the first phase, they are all part of the high corridor. In the first phase, the Metro New Bus Stand (New ISBT), Zira Mile, Bhootnath Road, Khemanik and Malahi will be connected to Pakadi (Malahi Pakdi) stations. The total cost of this project has been called Rs 13,365 crore.
as soon as the metro rack reaches Patna, technical experts will conduct intensive examination of power system, security standards and other operating aspects. This process will ensure the reliability and security of the metro in the future.
as soon as the test is completed, the trial run of Patna Metro will be started. The city will get a transformative public transport system, which will be smart, safe and environmentally friendly.